ASTM F2170 STANDARD TEST METHOD PDF

Career

ASTM F formally recognizes the use of in situ probes as a means of conducting relative humidity testing. In fact The Standard The In-Situ Method In-situ concrete moisture testing places sensors, or probes, inside the slab itself . This test method covers the quantitative determination of percent relative testing. The ASTM F standard represents a fundamental change in how. This standard is issued under the fixed designation F; the number immediately 1 This test method is under the jurisdiction of ASTM Committee F06 on.

Author: Yoll Dougore
Country: Iran
Language: English (Spanish)
Genre: Relationship
Published (Last): 4 September 2015
Pages: 437
PDF File Size: 10.35 Mb
ePub File Size: 13.8 Mb
ISBN: 199-2-79452-488-4
Downloads: 84434
Price: Free* [*Free Regsitration Required]
Uploader: Mezinris

Logically then, moisture levels at the bottom methid a slab will read higher from those at the surface. Does the finish roof product have specifications for testing the concrete deck?

In that case, builders did not allow the slab sufficient time for concrete moisture levels to equilibrate reach equilibrium moisture content according to relative humidity RH. Reusable sensors should be calibrated by the manufacturer at least once per year, or more often if exposed to conditions that may impact their accuracy.

The first thing I would look at is the assembly that you are installing. Be sure to familiarize yourself with ASTM F and choose the best concrete moisture test method for the job. Jason, I appreciate this means to contact you. If you forward to 1: The depth is calculated to the bottom of the test hole the location of the installed RH sensor or probe.

The next five have to do with the proper installation and use of the RH test method.

  LA CATHEDRALE ENGLOUTIE PDF

Know the required depth of the test holes. And moisture can still be an issue at grade so concrete foundations must be designed to include proper moisture drainage. Learn how your comment data is processed. At this point, if one test fails, they all fail.

10 Guidelines for ASTM F2170 Preparation and Testing

ASTM F formally recognizes the use of in tesst probes as a means of conducting relative humidity testing. Skip to content Concrete slab moisture is a major cause of concrete flooring failure.

The test hole depth is not a fixed depth, but it must be calculated based on slab thickness and number of drying sides: After the initial reading, readings can be updated at any time desired with two conditions in mind: These requirements for the standard apply regardless of the RH test method being used. Section 9 of the standard requires that both the slab and the ambient air above it must be at service conditions for a minimum of 48 hours before testing.

Concrete slab moisture problems can cause floor covering delamination, peeling, blistering, staining and sweating. Meeting this standard provides the groundwork for limiting moisture-related flooring problems and the many liabilities and mitigation problems that can result from excess moisture.

For most RH testing systems, this includes cleaning any debris stndard of the test hole and inserting the necessary liner in the hole. That being said, there are many people that have used F testing methodology for testing roof mfthod with this understanding. RH Testing and Reporting Drill and prepare the test holes. Sub-grade water vapor can permeate even well-mixed and applied slabs. September 6, at In this way, in situ measurement provides a composite picture of overall slab moisture levels, and provides the data necessary to make business decisions regarding flooring installations.

  GUIA YOUTHING MALAGA PDF

April 7, at 3: That being said, I have heard a couple of different methods people are using. If i have an area of approx sq ft and have done the required testing for the area, and 5 fail mdthod 3 pass does the whole area fail? For flooring and concrete professionals, ASTM F provides the standard for using relative humidity RH testing when measuring moisture content in concrete slabs.

10 Guidelines for ASTM F Compliance

F requires three test holes for the first ft 2 and, at least, one additional hole for each additional ft 2. April 3, at We recommend placing the serial number decal which also helps track certification of each sensor on the corresponding test hole on the mapped report. UPS peak season may cause delays.

How do you handle this problem? With all areas of ASTM-compliant RH testing, precision is key and data integrity must also be the focus for each flooring professional. Concrete slab moisture is a major cause methox concrete flooring failure.

ASTM F Explained – ASTM F Information

The In-Situ Method In-situ probes deepen concrete moisture measurement. October 27, at The total area of the slab and the number of test holes must be recorded on your report. Note that the liner requirements have been updated and the hole tsandard to be fully lined to meet the ASTM standard.